Knowby
BYD Vault Drawer Installation
1
Step 1 of 4

Place drawer in wellside centered with an equal gap on either side of drawers

Leave a slight space (Roughly 10mm) to the rear of the drawer system.

2
Step 2 of 4

Mark required drill holes and drill through wellside floor using 8M Drill bit

Clean and remove any swarf

3
Step 3 of 4

Place 4x 8x25 nuts in drilled holes with washers tighten in place

4
Step 4 of 4

After inserting drawer leave a space and slide in the last two bearings and its bearing plate to each side at the front of the drawer

bearings are secured in place with an M10x25 nut with spring and flat washer

bearing plate is secured with and M6x16 nuts

Place drawer slider on top of drawer

(NOTE)

Some drawers will come assembled in this case you will not need to add the bearing and bearing bracket, to install the drawers and drill holes simply place drawer set in place and then slide drawers open to access drill hole locations.