Preventative Maintenance Checks.

Personal Protective Equipment (PPE). Gloves and Safety Glasses. If you don’t already have a pair of gloves and safety glasses, please see the store worker.

QA Sheet. You will find a QA sheet at the machine, if there is no QA sheet there, see the team leader or production. A QA sheet will need to be completed at the start, throughout and, at the end of the day.
There are no tools required.

Turn the main isolater switch (power switch) to On.

Press the black Reset button to reset the machine, you should hear a slight click noise.
Turn the hydraulics switch to the right to start the hydraulics. You should hear the hydraulics start, if not repeat step 5.
Turn the lubrication switch to the right to turn it On.

Add in your measurements by tapping the space to the right of Length MM.

Press the green start button to Start.