Cutting line Bin unloading
Procedure for loading bins at end of cutting line
Procedure for loading bins at end of cutting line
1
Step 1 of 17Forklifts are only to be operated by trained employees. Refer to safe operating procedures here (insert forlift SOP)
First - Start with two empty bins.
2
Step 2 of 17Staple the label on.
3
Step 3 of 17Put the stapler back in the tube.
4
Step 4 of 17Drive the bin in.
5
Step 5 of 17Lift the fork up.
6
Step 6 of 17The orange light will flash, and then stay green when in position
7
Step 7 of 17So wait for orange light to stop flashing and then the box when it's green it's in the right position.
8
Step 8 of 17The product will drop automatically when the weight gets to 1890.
9
Step 9 of 17The light goes out, the product drops and then green light switches to the other side.
10
Step 10 of 17Reverse bin out and place bin on the other side of shed.
11
Step 11 of 17Take the other bin and place it under hopper.
12
Step 12 of 17Follow the same process.
13
Step 13 of 17Once green light goes solid, it's in the right place.
14
Step 14 of 17Once the bin is full, repeat the process.
15
Step 15 of 17Second bin out.
16
Step 16 of 17Stack bin on top of the other.
17
Step 17 of 17Take both bins away for storage.