


Preventative Maintenance Checks.

Personal Protective Equipment (PPE). Gloves and Safety Glasses. If you don’t already have a pair of gloves or safety glasses, please see the store person.

QA Sheet. You will find a QA sheet at the machine, if there is no QA sheet there, see the team leader or production. A QA sheet will need to be completed at the start, throughout and, at the end of the day.
There are no tools required.

Turn the red switch On, located at the back of the machine.
Turn the touch screen console power switch to the left to turn the machine On.
Press the Enter button on the screen.
Turn on the light curtain and pump by pressing the light curtain button and the pump button on the touch screen.

Add in your mesurements by pressing the Current product length and add in your quantity by pressing Set Quantity

Press the green Start button.