

Note: When pumping using the lever: At the start there will be no pressure felt on the manual lever for the first 30 seconds, then it will start to build.

When the hoist is fully opened onto the ground – follow steps 3-5 to raise the platform manually.
Screw in the manual lever fully.
Using the lever, start pumping up and down.
Once you feel a little pressure on the lever, you will notice the platform raising and the roll stop going up.

When the hoist is stowed away or at van floor level – follow steps 7-9 to lower the platform manually.
Turn the release (red knob only) to the left to unfold / open up.
You can stop the hoist at any position by closing the release (turn to the right).
Once hoist is opened to van floor or ground level, ensure the release is turned to the close position (turn to the right).
(Lefty Loosey – Righty Tighty)

Remember to test the manual system once every three months.