Knowby SUPAWOOD
Knowby
Supawood Lock Up & Alarm Procedure
How to close the Supawood premises in a secure manner at close of business
How to close the Supawood premises in a secure manner at close of business
1
Step 1 of 12
<p>Ensure all external office doors are closed &amp; secured from the outside. There are three doors. The front door, the kitchen door &amp; the double doors into the breezeway.</p>

Ensure all external office doors are closed & secured from the outside. There are three doors. The front door, the kitchen door & the double doors into the breezeway.

2
Step 2 of 12
<p>Set the office alarm using the pad to the left of the front door.</p><p>The office is now closed &amp; alarmed.</p><p>Move to the Warehouse</p>

Set the office alarm using the pad to the left of the front door.

The office is now closed & alarmed.

Move to the Warehouse

3
Step 3 of 12
<p>Ensure foiling machine is cooled down and switched off</p>

Ensure foiling machine is cooled down and switched off

4
Step 4 of 12
<p>Ensure the 3 warehouse PA doors are locked</p>

Ensure the 3 warehouse PA doors are locked

5
Step 5 of 12
<p>Switch off the (red) warehouse power kill switch. You'll hear a &quot;clunk&quot; and the warehouse lights will go off.</p>

Switch off the (red) warehouse power kill switch. You'll hear a "clunk" and the warehouse lights will go off.

6
Step 6 of 12
<p>Check the lights on the mezzanine are switched off (they aren't on the warehouse kill switch circuit, the switch is just next to the PA door into the offices)</p><p>Move to the Factory</p>

Check the lights on the mezzanine are switched off (they aren't on the warehouse kill switch circuit, the switch is just next to the PA door into the offices)

Move to the Factory

7
Step 7 of 12
<p>Switch off CNC machines as per their shutdown procedures</p>

Switch off CNC machines as per their shutdown procedures

8
Step 8 of 12
<p>Ensure PA doors are locked (x2) (button should be pressed in)</p>

Ensure PA doors are locked (x2) (button should be pressed in)

9
Step 9 of 12
<p>Ensure IAT machine is cooled down and switched off</p>

Ensure IAT machine is cooled down and switched off

10
Step 10 of 12
<p>Switch off the factory power kill switch at the front door of the factory building</p>

Switch off the factory power kill switch at the front door of the factory building

11
Step 11 of 12
<p>Set the alarm for the factory &amp; leave the premises.</p><p><br></p>

Set the alarm for the factory & leave the premises.


12
Step 12 of 12
<p>Ensure the front gate is closed before driving away.</p><p>Supawood is closed &amp; secure.</p>

Ensure the front gate is closed before driving away.

Supawood is closed & secure.