Knowby
Rosemount Ag

Get VRI going to stockwater line
1
Step 1 of 4
Go to pump shed on channel at green rises road
2
Step 2 of 4
Go into pump shed. And find the tap on top of the main VRI line
3
Step 3 of 4
Open tap so that it is parallel with the vertical pipe
4
Step 4 of 4Check tanks or troughs to ensure water flow is improved. And report the issue to manager