

Assemble kitchen
1
Step 1 of 442
Step 2 of 44Start with the base piece
3
Step 3 of 44Tear off the two spacer washers
4
Step 4 of 44
Washers will be used later for the fold down part of the Kitchen
5
Step 5 of 44
Get one pair of the large locking drawer slides
6
Step 6 of 44
M5 Fasteners
7
Step 7 of 44Get the Drawer) slides to the base
8
Step 8 of 449
Step 9 of 4410
Step 10 of 44
11
Step 11 of 4412
Step 12 of 44Identify the Drawer) slides
13
Step 13 of 4414
Step 14 of 44
15
Step 15 of 4416
Step 16 of 4417
Step 17 of 4418
Step 18 of 44
19
Step 19 of 4420
Step 20 of 4421
Step 21 of 4422
Step 22 of 44Coffee drawer into its drawer slides
23
Step 23 of 44
24
Step 24 of 44Fit the handle to the coffee, Drawer)
25
Step 25 of 44
Get the bungee cord
26
Step 26 of 44
Cat length approximately 300 mm long and is not critical
27
Step 27 of 44
Feed one in through the hole and then tie a knot
28
Step 28 of 44Pull it tight then tie off the end
29
Step 29 of 44Trim the ends so it is neat
30
Step 30 of 4431
Step 31 of 4432
Step 32 of 4433
Step 33 of 44
Fit the rubber bumpers
34
Step 34 of 4435
Step 35 of 44
36
Step 36 of 4437
Step 37 of 44
38
Step 38 of 44
39
Step 39 of 4440
Step 40 of 44
41
Step 41 of 4442
Step 42 of 44
43
Step 43 of 4444
Step 44 of 44It should look like this