Setup
Requirements
2 people (minimum)
Equipment
Wall Panel Tool
PPE
Steel Cap Boots
Hi-Vis Vest
Check Track Setup
Ensure the operations supervisor has set up the track correctly.
Raise Folding Section Extension Seals
Using the wall panel tool, raise the folding section extension seals.
Loosen Folding Section
Loosen the folding section extension pieces and raise the extension seal to separate the end wall pieces.
Open Flaps
Open the flaps on the extension section and lock them in place
Raise End Extension Seal
Raise the extension seal on the end piece
Store End Piece
Pull the end piece out of the wall cavity and slide it along the track and into storage
Store Folding and Extension Section Pieces
Slide the next folding section piece into storage along with the first extension section piece
Store Second Extension Section Piece
Raise the extension seal on the extension section piece then slide it along the track into storage
Raise First Door Extension Seals
Raise the three door extension seals.
They are on the:
Hinge Side Door Frame
Door
Latch Side Door Frame
Store First Door
Slide the first door along the rails and store it
Pro Tip: Raising Wall Piece Extension Seals
Use the wall panel tool as a lever on the side of normal wall pieces to raise the extension seals.

Pro Tip: Lowering and Raising Extension Seal
Lower the extension seal by moving the bar to the top.
Raise the extension seal by moving the bar to the bottom.
Remove Wall Pieces
Remove each wall piece by raising the extension seals, sliding them along the track and storing them
Remove Second Door
Raise the extension seals on the second door, slide and store it
Remove to End Piece
Remove all the pieces up to the end piece
Remove End Piece
Raise the extension seal, pull the end piece from the wall (this may take some effort), slide it along the track and store it.