Before installing.
The site is ready and there is access
The floor is level
The table position matches the plan
Powered jobs: check where the power feed is
Unpack.
Check the part count against the label
Look for transit damage
Photograph any damage before starting

Position the columns.
Stand each column on its glides in the position on the plan
Short skins face the table centre (and the power feed on powered jobs)
3-column tables: the centre column sits under the top join

Lift the top on.
Two-person lift minimum
Locate each bracket in its rebate

Dry-join tops only.
Place the first section, then the second
Fit the biscuits and push the sections together
Tighten the 4 bench-top connectors from underneath
Check the join is flush with no gap

Fix the top.
Working from underneath, fix up through each bracket into the top
2 x 25 mm black hex screws per bracket
Powered jobs only.
Route the cable to the supply as shown on the site plan

Check.
The table is stable and level
The top is seated in every bracket rebate

Hand over.
Clean and do a final inspection
Take photos
Get customer sign-off