Before you start any work on any job locate the QC sheet

You should be able to find the QC sheet hanging on the lights outside of the oven

Before we start working on a Body/Tray on the assembly line ensure all Fabrication checks have been completed and signed off
When you complete any task on a job ensure to sign the QC sheet

Before vehicle fitment ensure all necessary QC checks have been signed off

Completed stage 2/3

Before vehicle fitment ensure FITTED AT UTEMASTER part of the QC sheet is complete

Attach all keys to the Vehicle keys
Ensure these are the correct keys (verify these fit/work)

Before final inspection ensure all of the necessary QC checks have been signed off
Once the QC sheet is complete move vehicle into the lights
Give QC sheet to a team leader (Isaac/Jesse) ready for their QC

Once team leader QC complete, the fit out is ready for a final inspection (must be completed by approved person, Aaron S, Josh M, Matt G or Rey M)

Post a photo of the Ute and the Sales order # to the WhatsApp group chat (Trailcore Quality)
eg. S12345 ready for inspection

Secondary inspection is done rework (if any) complete
Move vehicle to suitable position for photo QC
CQC: Ensure you can see ute from all angles no obstructions
Recommend you are outside

Complete photo QC using the AppSheet Photo QC
Use yellow step to take photo of roof