Schedule of Common Lifts: How to Sling Common Loads
Slinging method and technical detail for common site lifts, one load per step, from Ballymore's Schedule of Common Lifts guide (BG_HSE-05.1, v2.0). A briefing tool for appointed slinger/signallers; read with the Site Lifting Management Plan. Covers the first 10 loads.
Slinging method and technical detail for common site lifts, one load per step, from Ballymore's Schedule of Common Lifts guide (BG_HSE-05.1, v2.0). A briefing tool for appointed slinger/signallers; read with the Site Lifting Management Plan. Covers the first 10 loads.
1
Step 1 of 10

Plywood

  • Load type: Loose load (timber)

  • Load description: Typical load, rigid sheets such as plywood

  • Lifting accessory: Webbing slings or chains, double wrapped

  • Ancillary equipment: Tag line to aid control

Slinging method

  • Double wrap to avoid slippage.

  • The load must be level for uniform loading.

  • Sleeves or secure packing should be used to avoid damaging materials or slings.

Alternative: None

Safety restrictions

  • Where choked, the SWL is reduced (20% or more – check with your Crane Supervisor).

  • Webbing slings must be protected from sharp edges and must not be worn, cut or damaged.

  • Always use tag lines.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

2
Step 2 of 10

Scaffold Boards

  • Load type: Loose load (timber)

  • Load description: Scaffold boards

  • Lifting accessory: Webbing slings or chains

  • Ancillary equipment: None

Slinging method

  • Double wrap to avoid slippage.

  • The load must be level for uniform loading.

Alternative: None

Safety restrictions

  • Where choked, the SWL is reduced (20% or more – check with your Crane Supervisor).

  • Webbing slings must be protected from sharp edges and must not be worn, cut or damaged.

  • Always use tag lines.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

3
Step 3 of 10

Scaffold Tubes

  • Load type: Loose load

  • Load description: Scaffold tubes

  • Lifting accessory: Webbing slings or chains

  • Ancillary equipment: Tag lines

Slinging method

  • Double wrap to avoid slippage.

  • The load must be level for uniform loading.

Alternative: None

Safety restrictions: None

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

4
Step 4 of 10

Frame Scaffold

  • Load type: Loose load

  • Load description: A-frame scaffold

  • Lifting accessory: Double wrap 2-leg chains / strops

  • Ancillary equipment: Tag lines

Slinging method

  • Chains / strops double wrapped and choked.

  • The load must be level for uniform loading.

Alternative: None

Safety restrictions

  • Check scaffolding clips before lifting.

  • Maximum of 5 frames in one lift.

  • All lifting teams must be familiar with the duration methods.

  • Ensure the scaffold fittings have been checked by a qualified scaffolder before the lift commences.

  • A-frames should be designed to be lifted.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

5
Step 5 of 10

Open Stillage

Photo shows method only. Safety hooks should be used.

  • Load type: Loose load

  • Load description: Open stillage

  • Lifting accessory: Webbing slings or chains

  • Ancillary equipment: Tag line

Slinging method

  • Where possible, lift load and stillage separately.

  • Where lifting together, two-leg chains / strops double wrapped around both load and stillage.

Alternative: None

Safety restrictions

  • Webbing slings must be protected from sharp edges and must not be worn, cut or damaged.

  • The load must be level for uniform loading.

  • If tubes are different lengths, ensure both slings are choked inside each end of all tubes.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

6
Step 6 of 10

False Work Crash Deck

  • Load type: Loose load

  • Load description: False work crash deck

  • Lifting accessory: Webbing slings or chains

  • Ancillary equipment: Tag line

Slinging method

  • Webbing slings or chains double wrapped.

  • The load must be level for uniform loading.

  • If decking are different lengths, ensure both slings are choked inside each end of all decking.

Alternative: None

Safety restrictions

  • Webbing slings must be protected from sharp edges and must not be worn, cut or damaged.

  • The load must be level for uniform loading.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

7
Step 7 of 10

K Guard Stillages

  • Load type: Loose load

  • Load description: K Guard stillages

  • Lifting accessory: Webbing slings / chain slings

  • Ancillary equipment: Tag line

Slinging method

  • K Guard delivered in stillage, 2.5T.

  • Use strops double wrapped.

  • 2-leg chains double wrapped.

  • Empty stillage should be lifted using 4-point lift.

Alternative: None

Safety restrictions

  • Webbing slings must be protected from sharp edges and must not be worn, cut or damaged.

  • The load must be level for uniform loading.

  • Only lift the frame using 4 designated lifting points when empty, using 4-leg chains.

  • Ensure K Guard panels are neatly stacked in the provided lifting frame.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

8
Step 8 of 10

Stillage Bins

Chains wrap round legs to avoid slippage.

Sketch shows the 4-leg method; photo shows the 2-leg method.

  • Load type: Loose load

  • Load description: Stillage bins

  • Lifting accessory: Chain slings

  • Ancillary equipment: Tag line

Slinging method

  • Two-leg chain slings wrapped around corner posts and choked.

  • 4-leg chain method: wrapped round 4 legs and linked back to master link, as per sketch.

Alternative: Webbing slings double wrapped, or 4-leg method as illustrated

Safety restrictions

  • Ensure stillage is loaded within capacity.

  • Check stillage for impact damage.

  • Beware of rusted bases.

  • Prevent damage to webbing slings.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

9
Step 9 of 10

Lifting Box

  • Load type: Lifting box for pallets and loose loads

  • Load description: Lifting box

  • Lifting accessory: Webbing slings and 4-leg chains

  • Ancillary equipment: Tag line

Slinging method

  • Attach chains directly to slings in fixed position.

Alternative: None

Safety restrictions

  • Ensure box is loaded within capacity.

  • Check box for impact damage.

  • Check attached slings daily and replace when necessary.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.

10
Step 10 of 10

Rubbish Skip Cradle

  • Load type: Rubbish skip

  • Load description: Skip, various sizes

  • Lifting accessory: Certified skip lifting cradle

  • Ancillary equipment: Lifting cradle

Slinging method

  • Skip lifting cradle to be used, master link to crane hook.

Alternative: None

Safety restrictions

  • Do not lift skip if materials are stacked above top level of skip.

Note: All skips certified for crane use must be marked with SWL sprayed on with stencil using yellow paint.

Note: If you choke a chain or webbing sling you must de-rate the SWL by 20% and only use chains from 0° to 90°.